Installation method of monitoring pole cross arm

Monitoring poles are mainly used to install monitoring cameras and infrared rays, provide effective information for road conditions, provide protection for people’s travel safety, and avoid disputes and thefts between people. Monitoring poles can be directly installed with ball cameras and gun cameras on the main pole, but some monitoring cameras need to cross the road or slightly expose the road to clearly shoot the road conditions in the largest range. At this time, you need to install an arm to support the monitoring camera.

Monitoring pole factory Qixiang

Relying on years of accumulated monitoring pole manufacturing experience and technical reserves, the monitoring pole factory Qixiang creates a safe, reliable and technologically advanced monitoring pole solution for you. Put forward your project requirements and we will provide professional configuration.

Monitoring camera poles can be made into variable diameter poles, equal diameter poles, tapered poles and octagonal monitoring poles. Regardless of the type of monitoring pole, the monitoring pole factory Qixiang will install the monitoring pole first before shipping it. When it is sent directly to the site, it can be connected to the underground foundation within 10 minutes to tighten the screws and nuts. The monitoring camera is connected to the reserved wires on the cross arm, and it can be used to shoot video after power is turned on.

So how does the monitoring pole factory Qixiang install the monitoring pole and cross arm?

Please see the following method:

If the cross arm is relatively short, you can directly connect the cross arm firmly to the main pole by welding and grinding. Be sure to pass the arm slightly through the main pole, but do not seal it, because the inside needs to be wired, and then galvanized and sprayed. Make sure the interface is smooth and the color is consistent. Then connect the wires from the inside of the pole, through the cross arm, and reserve the camera port. If it is an octagonal monitoring pole, the wall thickness is large, the straight rod size is large, and the cross arm is long and thick, which affects transportation and installation. Then you need to make a flange on the cross arm and reserve a flange on the main pole. After transporting to the site, just dock the flanges. Note that when docking, pass the internal wires through. At present, these two cross arm installation methods are more commonly used and more common.

Notes

When the length of the horizontal arm is less than or equal to 5 meters, the material thickness of the horizontal arm part shall not be less than 3mm; when the length of the horizontal arm is greater than 5 meters, the material thickness of the horizontal arm part shall not be less than 5mm, and the outer diameter of the small end of the horizontal arm part shall be 150mm.

The cantilever shall comply with the relevant technical standards and the actual conditions of the intersection, and provide relevant technical parameters and arrival standards.

All steel components are hot-dip galvanized for corrosion prevention, and the specific standards depend on the intersection phenomenon. All welding points must be fully welded, strong and have a beautiful appearance.

The above is what the monitoring pole factory Qixiang introduces to you. If you are looking for a monitoring pole, you can contact us at any time to get a quote, and we will tailor it for you.